B.Tech. Agricultural Engineering · Semester 8 — Electives
Management of Canal Irrigation System
Syllabus lecture plan
- 01Typical network of canal irrigation system and its physical components
- 03Canal alignment: general considerations
- 04Different parts of canal sections, performance indicators for canal 3 irrigation system evaluation
- 05Estimation of water requirements for canal command areas and 2 determination of canal capacity
- 06Base period, water duty and delta, relationship between base period, duty 2 and delta; factors affecting duty and method to improve duty
- 07Silt theory: Kennedy's theory, design of channels by Kennedy's theory
- 08Maintenance of unlined irrigation canals, measurement of discharge in 2 canals
- 09Rostering (canal running schedule) and warabandi, rotational irrigation, 2 pre-requisite of warabandi
- 10Necessity of canal lining: advantages and disadvantages, types of canal 3 lining and desirable characteristics for the suitability of lining materials, design of lined canals
- 11Functions of distributary head and cross regulators
- 12Canal falls, their necessity and factors affecting canal fall, types of canal 2 falls
- 13Sources of surplus water in canals and types of canal escapes
- 14Requirements of a good canal outlet and types of outlet
- 15Participatory irrigation management (PIM), water user's association: 2 necessity, structure, function and duties
Part of the B.Tech. Agricultural Engineering curriculum (ICAR recommendations). Upload or find notes, previous-year papers and quick-revision reels for each lecture on theciae.